Good surface preparation means the wall is clean, sound, dry and dull before any paint goes on. In practice that is a fixed sequence: inspect, protect the room, clean, remove anything loose, repair, let repairs dry, sand lightly, remove the dust, prime where needed, then paint. Skip a step and the paint shows it, usually within months. Below is how we run that sequence on Dublin and Kildare homes, how long each stage really takes, and the point where the right decision is to stop sanding and get something tested.
TL;DR
- Paint is a finish, not a repair. Cracks, flaking, grease, damp and dust all show through or cause early peeling.
- The order matters: clean, strip loose material, fill, let it dry, sand only enough, vacuum and wipe, then prime.
- New plaster, bare patches, stains and hard surfaces (metal, plastic, UPVC, laminate) each need a matching sealer or primer, not just wall paint.
- In older Irish homes, do not dry-sand or scrape suspect textured coatings or old paint until a competent person has assessed them.
- When you get a quote, ask for the preparation specification in writing, with exclusions.
Table of Contents
- Why preparation decides how the job looks and lasts
- The preparation sequence, step by step
- Cleaning walls before painting
- Filling holes and repairing cracks
- Sanding walls: how much is enough
- Priming and sealing: matching the product to the surface
- Metal, plastic, UPVC and furniture
- Exterior preparation
- When to stop sanding: asbestos, lead and damp
- What to ask for in a quotation
- Our approach to preparation
- Hiring us for the preparation and the painting
- FAQ
- Sources
Why preparation decides how the job looks and lasts
A professional painter spends more time on the wall than on the paint. The reason is simple: paint only bonds to what is underneath it. Sherwin-Williams describes a properly prepared surface as clean, solid and dry, without cracks and imperfections. Painting over cracks, flaking paint, grease, dampness or dust is what commonly leads to visible defects, blistering, poor adhesion and early peeling, according to Benjamin Moore’s guidance on preparing walls.
There is also a lighting issue. A wall is judged by light skimming across it. Small ridges, filler edges and dust that disappear under a ceiling light can stand out when the sun comes through a window at a low angle. That is why we inspect by hand and by raking light before anyone opens a tin.

It is also why the cheapest quote is not always the cheapest job. The visible painting may be a third of the labor. The rest is the work you will never see, and it is the part that decides whether you repaint in three years or ten.
The preparation sequence, step by step
This is the order we follow indoors. Each step exists because the next one depends on it.
- Inspect. Walk the room with a bright torch held flat to the wall. Mark cracks, nail pops, hollow-sounding plaster, stains, mould, flaking paint and old filler. Press suspicious patches with a thumb. Note anything that points to damp.
- Protect the room. Clear or cover furniture, lay drop cloths, mask skirting, window frames, sockets and door hardware. Do this before sanding, not after, because dust gets everywhere.
- Clean and degrease. Kitchens, hallways, stairwells and bathrooms collect grease, nicotine and soap film. Wash with a suitable cleaner, rinse and let it dry. Paint will not grip a greasy wall.
- Remove loose and flaking coatings. Scrape until you reach a firm edge. Anything that lifts with a scraper will lift under new paint too.
- Repair. Fill holes and cracks with filler or joint compound and a putty knife, caulk gaps at trims with painter’s-grade caulk, and re-plaster failed areas.
- Let repairs dry. Not touch-dry: fully dry, per the product’s data sheet. Thick fills need longer.
- Sand. Level the filler edges and dull any glossy finish. Use fine to medium paper on a sanding block. Sand enough to level and to give the surface some grip, not to strip it.
- Remove the dust. Vacuum, brush down, then wipe with a damp cloth and let it dry. Dust under primer is the usual cause of a gritty finish.
- Prime where needed. Bare plaster, filler patches, stains and incompatible old coatings get a suitable primer or sealer first.
- Paint to the specification. The right number of coats, the right product, in the right conditions.
That sequence matches the professional order set out in the research behind this guide: clean, sound, dry and free of loose material before any finish goes on.
Cleaning walls before painting
Cleaning is the step people skip because it looks like it does nothing. It does the most. Oils, grease and soap residue stop paint bonding, and you cannot see most of them.
What we look at first:
- Kitchens: grease film on walls near the hob and on cabinet doors.
- Bathrooms and utility rooms: soap scum, condensation marks and mildew.
- Hallways and stairs: hand marks, scuffs and dirt around switches.
- Smokers’ homes: nicotine staining, which often bleeds through ordinary paint and needs a stain-blocking primer.
Wash from the bottom up on heavily soiled walls, so dirty water does not streak into clean areas, then rinse with clean water. Allow the surface to dry fully before you sand or fill. On mould, treat it properly rather than painting over it, and find out why it is there. Mould that returns usually means damp or poor ventilation, and no paint will fix either.
On ventilation: if you find purpose-made wall vents while decorating, do not paint them over or block them. The Irish Times’ property column advises against leaving them painted over or blocked, because in most homes they provide background ventilation to habitable rooms. Mask them properly and keep them clear.
Filling holes and repairing cracks
Filling is where most of the visible quality comes from. A few principles:
- Match the repair to the defect. Small nail holes take a light filler. Hairline cracks in plaster need to be opened slightly, cleaned out and filled. Wider or recurring cracks may be movement, and need a flexible product or a proper plaster repair.
- Slightly overfill, then sand flush. Filler shrinks as it dries. A flat wall comes from overfilling a touch and sanding back, not from trying to get it perfect in one pass.
- Fill gaps at trims with caulk. Where skirting, architraves and windows meet the wall, painter’s-grade caulk gives a clean line that rigid filler will not.
- Spot-prime filled areas. Filler is more porous than the wall around it. Unprimed, it soaks up paint differently and shows as dull patches, a defect called flashing.
If a wall has large areas of blown, hollow or crumbling plaster, filling is the wrong tool. That is a plastering job, and it should be done before the decorating, not around it. We handle both, which avoids the gap between trades; see our plastering service.
Sanding walls: how much is enough
Sanding is about two things: levelling imperfections and giving glossy surfaces a key. It is not about stripping the wall.
- Over filler and ridges: use fine to medium paper on a block, working with light pressure so you do not cut into the surrounding wall.
- Over gloss and satin: a light scuff dulls the sheen. For previously painted surfaces with oil-based paint, Benjamin Moore specifies 100 to 150 grit.
- Over sound matt emulsion: often a light once-over is all it needs.
Then deal with the dust, because that is where sanding goes wrong. Vacuum the wall, the skirting and the floor, brush the top of door frames, then wipe with a damp cloth and let it dry. If you sand and paint the same afternoon without removing the dust, the roller picks it up and puts it back on the wall.
One firm exception: do not sand old coatings in an older property until you know what they are. More on that below.
Priming and sealing: matching the product to the surface
Primer is part of preparation, not an optional extra. It does three jobs: seals porous areas so the finish dries evenly, blocks stains, and gives difficult surfaces something to grip.
| Surface | What it needs |
|---|---|
| Previously painted, sound, matt | Clean, light scuff, vacuum and wipe, then paint |
| Previously painted, gloss or satin | Clean, abrade to dull the sheen, primer if the product system requires it |
| New plaster | Fully cured and dry, then a suitable sealer or mist coat before the decorative coats |
| Plasterboard | Joints taped, filled and sanded, then sealer or primer |
| Repaired patches | Spot-prime so the patch does not flash through |
| Stains (water, nicotine, grease) | Cure the cause first, then a stain-blocking primer |
| Metal, plastic, UPVC, laminate | Clean and degrease, key the surface, then an adhesion primer rated for that material |
For new plaster and plasterboard, the principle is consistent across manufacturers: GoodHome’s emulsion data sheet sold at DIY.ie says new plaster or plasterboard should be sealed with a plaster sealer, and painted surfaces should be sanded, clean and dry.
Always follow the data sheet of the product you are actually using. Drying and repaint times vary by product. For example, Juno’s technical listing for Waterprim gives 30 minutes touch-dry and a minimum six-hour repaint time for that specific primer, and says the substrate must be clean, completely dry and free from efflorescence and mould. Those times belong to that product. Do not carry them over to another one.
Metal, plastic, UPVC and furniture
Hard surfaces fail differently from walls. Paint does not soak in; it sits on top, so adhesion is everything.
The general approach is to clean and degrease, abrade or otherwise key glossy surfaces, remove contamination, and use an adhesion or anti-corrosion primer where the system requires it. For plastic, do not assume ordinary wall primer will bond. Use a product expressly rated for plastic and follow its preparation and recoat instructions. Waterprim, mentioned above, is listed for non-ferrous metal, plastic, GRP, UPVC, melamine and varnish, which shows the kind of substrate list you should look for on a tin.
Can you use rubbing alcohol to prep metal? It may remove some light residues, but it does not remove rust, loose coating or all grease, so it is not a universal substitute. Follow the coating manufacturer’s cleaner or degreaser, abrasion, rust-treatment and primer instructions. Then test adhesion on a hidden area before committing to the whole piece.
That test-patch habit is worth adopting anywhere. Sherwin-Williams recommends testing an inconspicuous area for adhesion or compatibility before a full application.
For kitchens, pine furniture and pieces that take daily wear, the quality of the finish depends on controlled preparation and a sprayed coating system. That is what our furniture spray painting service is built around.
Exterior preparation
Outside, preparation adds weather and moisture. The steps are familiar, but the margin for error is smaller:
- Remove mildew with a suitable treatment.
- Clean from the top downward.
- Scrape, repair and caulk defects.
- Prime bare areas.
- Do not paint until the surface is completely dry and the label’s temperature and weather limits are met.
Behr’s exterior preparation guide warns against painting immediately after rain or when temperatures drop below the label minimum. In Ireland, that rules out more days than you would like. Preparation can take longer than the painting itself, which is a good reason to plan the work for a settled spell. Our guides on preparing your home for exterior painting and why prep comes first outdoors go into the Irish specifics, and painting pebble dash without trapping moisture covers one of the trickier cases.
If you are preparing a house for sale and wondering how much to fix at all, it helps to know the alternatives. Some buyers purchase as-is, as a US guide on selling a house without repairs explains, though that is a Rhode Island service and the rules and market differ in Ireland. If you are selling on the open market here, a clean, well-prepared exterior and interior is usually the cheaper route to a good first impression.
When to stop sanding: asbestos, lead and damp
In Ireland, surface preparation is also a safety check. Homes built or refurbished before 2000 can contain asbestos in textured coatings, panels, tiles or boiler-area materials, and older paint may contain lead. The point where you stop and call someone is the point where the surface is suspect.
On textured ceilings, one Irish asbestos information site says a textured ceiling in a pre-1985 property should be treated as containing asbestos until tested, and that only a sample sent to an accredited laboratory can confirm it.
What that means in practice:
- Do not dry-sand, heat or aggressively scrape suspect coatings or textures.
- Have intrusive work assessed by a competent person before you start.
- Use specialist contractors if asbestos is confirmed. Current guidance comes from the Health and Safety Authority, whose publication index lists a 2025 code of practice on exposure to asbestos.
- Treat damp as a cause, not a cosmetic issue. Efflorescence, tide marks, bubbling and mould need the source found and fixed first. Primer is not a damp treatment.
This changes the programme and the price, which is exactly why a decent quote separates ordinary preparation from remedial work.
What to ask for in a quotation
A contractor’s quote should separate routine preparation (cleaning, filling, sanding, priming) from remedial work such as damp, mould, failed plaster, lead-risk coatings, asbestos investigation, access equipment and major repairs. Ask for these in writing:
- The preparation specification, room by room.
- The number of coats and the products to be used.
- Drying assumptions between stages.
- Protection of floors and furniture, and waste removal.
- Exclusions, and what happens if hidden defects turn up.
If two quotes differ widely, the gap is usually in line 1. One includes preparation and the other assumes the walls are already fine.
Our approach to preparation
We have painted homes and commercial spaces in Dublin and Kildare for over 15 years, and what we say to clients at the first visit is the same each time: the paint is the last, quickest part. Most of what decides the result happens before the first coat.
That is why our quotations are written around the property rather than a standard rate. We look at the surface, tell you what we find, and list the preparation that the job needs. When we find something that is not a decorating issue, such as damp or a suspect coating, we say so rather than paint over it, because a finish on a failing wall is a callback waiting to happen.
We also keep photographs of previous work, so you can see how a prepared wall looks under raking light, not just in a staged shot.
— Constantin
Hiring us for the preparation and the painting
If you want the sequence above done properly, we handle the whole job: repairs, plastering where the wall needs it, sanding, priming and finishing. Start with house painting for homes, interior and exterior painting for room-by-room or whole-building work, or commercial painting for offices and shared spaces. Tell us about the property, and we will quote on what the surfaces need. You can reach us through alextrendpainters.ie.
FAQ
Do I really need to sand walls before painting?
Usually yes, but lightly. Sanding levels filler edges and ridges and dulls glossy finishes so new paint can grip. Sound matt walls may only need a light scuff, and suspect old coatings in older homes should not be dry-sanded at all until assessed.
What is the correct order for prepping a wall?
Clean, remove loose or flaking paint, fill and caulk, let the repairs dry, sand, remove all dust, prime where needed, then paint. Doing it out of order, for example sanding before cleaning grease, drives dirt into the surface.
Can I paint straight over new plaster?
Not with ordinary paint straight away. New plaster must be cured and dry, and then sealed with a suitable sealer or primer before the decorative coats. Check the data sheet of the paint you are using, as the requirements differ by product.
Is primer always necessary?
No, but it is essential on bare plaster, filler patches, stains and hard or glossy surfaces. Sound, clean, previously painted matt walls in a similar colour often do not need it. A primer rated for the specific material matters on metal, plastic and UPVC.
Sources
- How to Paint Prep, Sherwin-Williams
- How to Prepare Walls for Painting, Benjamin Moore
- How-to Prepare a Home for Painting, Behr
- Juno Waterprim technical listing
- GoodHome Tough & Durable Vence Matt Emulsion, DIY.ie
- Blocked-up air vents when decorating, The Irish Times
- Asbestos in ceilings: Artex, popcorn and ceiling tiles in Irish homes
- Health and Safety Authority publication index, NBS




