Retrofitting wasn't financially viable without additional value-adding measures in four of seven Dublin office case studies assessed by the Society of Chartered Surveyors Ireland in 2025. That changes the starting question for office refurbishment. Before choosing colours or requesting quotations, decide which works the building needs, what they'll achieve and whether the investment makes sense.
A cosmetic refresh, compliance work and an energy retrofit are different purchasing decisions. They can share a programme, but a handsome interior can still sit inside an inefficient building. For a facilities manager, the job is to connect scope, money and access without buying unnecessary work or hiding essential upgrades behind new finishes.
Table of Contents
- Office Refurbishment Costs and Timelines
- Why So Many Irish Offices Need Works
- Cosmetic Refresh or Full Retrofit
- Health Safety and Strip-Out Waste
- Phases from Survey to Handover
- Scheduling Work Around a Live Office
- Painting Choices That Hold Up in Use
- Budgeting Before Quotes
- Set the Scope Before You Enquire
Office Refurbishment Costs and Timelines
In 2025, the Society of Chartered Surveyors Ireland estimated €225 to €1,814 per square metre for retrofitting Dublin offices in good condition aged 20 to 35 years, as reported by RTÉ. That's a retrofit benchmark for a defined building group, not a price list for painting, partitions or every office refurbishment in Ireland.
Office refurbishment scopes, cost bands and programmes
| Scope | Cost guide | Typical programme | Main cost driver | Disruption |
|---|---|---|---|---|
| Cosmetic refresh of finishes | Price as a separate decorating package when services stay | Room-by-room night working or a planned floor shutdown | Paint, preparation, joinery and reception finishes | Low when zones can be isolated |
| Targeted services upgrade | Build an itemised allowance for the selected systems | Longer access for installation, testing and making good | Lighting, controls and local ventilation | Medium, with affected zones closed |
| Full energy retrofit | Test against the published retrofit range using a building-specific design | Survey, design, procurement, installation and commissioning determine duration | Heating, ventilation, lighting and associated building work | High, potentially requiring vacant floors |
| Repositioning and fit-out | Price fit-out and building improvements together | Design and approvals precede the on-site fit-out | Partitions, meeting rooms and landlord areas | High unless the suite is empty |
The table deliberately avoids assigning a universal price or completion period to each category. A clean, empty floor with sound plaster is a different job from an occupied suite with damaged walls, inaccessible ceilings and services that need replacement.
Read the scope before the rate
A cosmetic refresh covers the surfaces people see and touch. It may include plaster patching, wall and ceiling painting, joinery refinishing and reception improvements. Its programme is governed by preparation, drying, furniture movement and the hours when contractors can enter.
Don't treat this as a discounted full retrofit. If the heating and ventilation remain untouched, their replacement cost doesn't belong in the decorating quotation. Equally, a low decorating total tells you nothing about whether those systems are suitable for continued use.
A targeted upgrade adds selected technical work, such as lighting controls or local ventilation improvements. The facilities manager must allow access above ceilings, temporary isolation and testing. Painting should follow the intrusive work, not conceal surfaces that another contractor will reopen.
A full energy retrofit requires an assessment of the building before an installation price becomes meaningful. Equipment selection, distribution routes, available electrical capacity and commissioning all affect the programme. A contractor's proposed site duration isn't the same as the complete project duration.
Repositioning goes further by changing how the property serves its intended occupiers. New meeting rooms, a revised reception, improved communal areas and altered circulation can involve both fit-out and building work. Keep those packages visible rather than compressing them into a single refurbishment allowance.
Include the cost of access
Occupied working introduces costs beyond the physical installation. Furniture moves, temporary accommodation, security attendance and restricted deliveries can all require separate allowances.
Community-facing commitments also deserve a place in the brief when they affect access or reopening. For an example of how a buildings-sector business presents its local activity, Pacific Mobile Structures in the community from Pacific Mobile Structures, Inc. is a useful reference, though it isn't an Irish cost benchmark.
Budget rule: Buy the smallest coordinated package that meets the building's operational, commercial and compliance needs.
Before requesting prices, tick the scope row you can defend and answer a separate question: will the floor remain occupied? Those decisions give contractors a much firmer starting point than an instruction to modernise the office.
Why So Many Irish Offices Need Works
At the end of 2024, Dublin's office market contained approximately 4.3 million square metres, with about 800,000 square metres vacant, according to the Irish Life Investment Managers property report. It records vacancy at 18.6%, above the 13.7% average for 2003 to 2024, and space approved or under construction for delivery during 2025 to 2027 falling from approximately 370,000 square metres at the end of 2023 to 190,000 at the end of 2024.
Those are market-wide measures, not a prediction for an individual lease. They do, however, explain why a landlord needs to examine the quality of an existing office rather than assume its location will carry the letting.

The existing suite is the product
Think of a crowded car park of older vehicles while the factory slows production: owners still have to make what's already there useful and attractive.
Say comparable Dublin suites are available nearby, but one has a tired lobby, damaged corridor walls and meeting rooms that don't suit video calls. The other has received a phased refresh, with a clearer entrance, repaired finishes and usable meeting space, giving a prospective occupier fewer immediate problems to price into the decision.
That doesn't establish a rental premium. It identifies practical objections the owner can remove.
A useful walk-through separates those objections into categories:
- First impressions: Scuffed doors, poor signage and worn reception joinery can make maintained space appear neglected.
- Daily usability: Meeting-room provision, desk arrangements and storage affect whether the suite suits the occupier's work.
- Access: Step-free routes, door clearances and circulation need assessment rather than cosmetic concealment.
- Building performance: Heating, ventilation, lighting and controls require technical review where comfort or consumption is a concern.
Appeal and performance need different tests
The person viewing a suite may notice fresh paint immediately. The facilities team will also ask how the space operates on a busy day, where maintenance access sits and what information supports the running-cost estimate.
A repainted floor can look current while leaving those questions unanswered. Conversely, an owner may have reliable building services but lose interest from prospective occupiers because the entrance and internal finishes look uncared for.
Walk the property with both perspectives. Record visible defects separately from operational complaints, then assign an owner to investigate each item. A decorator can assess failed coatings; a services engineer should investigate uneven temperatures or ventilation concerns.
The commercial case becomes clearer when each proposed item answers a specific objection. Approve a defined scope because it improves the property in a defensible way, not because nearby offices are vacant.
Cosmetic Refresh or Full Retrofit
Office refurbishment means coordinated improvement of an existing workplace. Decorating is one part of it, fit-out concerns the workplace elements being planned and installed, and retrofit focuses on improvements to existing building systems and performance.
The house analogy is straightforward: decorating repaints the rooms, a targeted upgrade replaces selected lights or controls, a retrofit improves the building fabric and heating arrangements, and repositioning changes the layout or intended use.
BER bands across Irish office units
The following distribution covers approximately 18,000 Irish office units examined by the CSO, as reported by The Irish Times.
| BER band | Share of office units | What it implies for scope |
|---|---|---|
| A | 2% | Already high performing on the rating measure; decoration may be sufficient if other needs are met |
| B1 to B3 | 10% | Examine actual consumption and operational needs before proposing a full retrofit |
| C1 to C3 | 29% | Assess whether selected services improvements should accompany finishes |
| D1 or lower | 59% | Cosmetic work alone won't address the weak energy rating |
The rating helps frame the investigation; it doesn't specify the work. A BER describes assessed energy performance, while bills show consumption under actual operating conditions. Neither replaces an inspection of the building and its systems.

Understand the regulatory direction
The revised Energy Performance of Buildings Directive requires Member States to address the worst-performing 16% of non-residential buildings by 2030 and 26% by 2033, while Irish guidance described a simplified non-domestic BER scale as due to take effect on 24 May 2026, according to the European Commission BUILD UP briefing.
These are national implementation requirements, not an instruction to every office owner to commission the same package. Before relying on a particular threshold or certificate position, confirm the current Irish requirements and how they apply to the property.
Don't assume a change in scale means the building itself has changed. Equally, don't assume an existing certificate settles what happens after major works. Include the BER assessor in the scope discussion where proposed alterations may affect assessed performance.
Choose using evidence rather than appearance
Before tendering substantial work, assemble the current certificate, available utility records, operating hours and relevant lease obligations. Ask the services designer to distinguish faults, poor controls and equipment that needs replacement.
A short redecoration project doesn't automatically justify a full energy retrofit. If a tenant needs damaged walls repaired before occupation, that can remain a bounded finishing package, provided it doesn't obstruct planned technical work.
The opposite mistake is more expensive: replacing ceilings and completing decorations while leaving known services work to follow. Establish where future access will be needed before sealing and finishing those areas.
Match the scope to the rating, meters, lease and occupancy, not to a mood board.
Low-VOC paint belongs in a discussion about coating selection and indoor conditions. It isn't evidence that the building's heating, lighting or ventilation performance has improved.
Health Safety and Strip-Out Waste
Stop before sanding, drilling or demolition if the material hasn't been assessed and there's a credible risk of hazardous substances. A job described as decorating can still disturb old coatings, ceiling components, gypsum board, floor finishes and concealed materials.
The EPA's Construction and Demolition Report for 2024_Final.pdf) states that construction and demolition contributed 13% of Ireland's 396,651 tonnes of hazardous waste that year. The category includes asbestos and construction materials containing hazardous substances, so a small internal scope isn't a reason to skip the survey.
Establish what can be disturbed
For an older office, review the asbestos information and arrange a competent assessment of materials affected by the work. The survey must relate to the intended intervention, including concealed areas contractors will need to open.
If suspect material is uncovered, stop the affected activity, prevent access and obtain specialist advice. Don't allow a general finishing crew to investigate by breaking, scraping or sanding it.
Ordinary preparation should follow the documented substrate assessment. Specify suitable dust extraction for permitted work, isolate occupied areas and keep waste routes away from desks and shared circulation wherever practicable.
Treat strip-out as materials management
The EPA's national construction and demolition statistics record 7,852,393 tonnes of C&D waste in 2024, with 81% of non-hazardous waste excluding soil and stone recovered through recycling or backfilling. Those national recovery figures aren't a project target; the site team still needs a plan for its own materials.
Survey what can stay before ordering removal. Sound doors, serviceable raised-floor components and reusable joinery shouldn't enter the waste stream merely because the office is being refreshed.
Separate gypsum, metal, timber, plastics and packaging where the collection arrangements support it. Agree container locations and collection times before strip-out begins, particularly where the loading bay serves occupied premises.
Final cleaning also needs a sequence. Eco Clean Solutions' guidance on removing building dust before wet cleaning is useful when preparing the post-works cleaning brief; cleaning must follow, not substitute for, hazardous-material controls.
Put these deliverables into the scope:
- Asset list: Identify retained, reused and removed items.
- Segregation plan: Name the waste streams, containers and authorised collector.
- Weight tickets: Keep collection and transfer documentation.
- Completion report: Record where the removed materials went and any departures from the plan.
Phases from Survey to Handover
A workable programme follows the dependencies between trades. It allocates dates to painting while accounting for repairs, electrical alterations and furniture moves that must finish beforehand.
The broad route is survey, definition, protection, execution and inspection. Within that route, the facilities manager needs clear approval points and named responsibilities.

Establish the job before mobilisation
Survey the building. Check measured plans, ceiling voids, floor boxes, plaster condition and existing coatings, alongside the relevant building records. Photograph defects and mark inaccessible areas for further investigation. Failure mode: discovering unsound plaster only after the finishing team arrives leaves both price and completion uncertain.
Fix the scope in writing. List surfaces, repairs, products, retained items and removals. Name wallpaper stripping, lining and joinery refinishing explicitly rather than assuming they're included. Missing preparation is a common reason apparently comparable quotations describe different jobs.
Design the occupied plan. Agree colours, lighting interfaces, furniture movements and a drawing showing which rooms remain live. Identify temporary storage and protected routes. A room can't be handed to a contractor if nobody has arranged where its contents will go.
Tender and programme the packages. Separate decoration from mechanical and electrical work while coordinating their interfaces. Put fixed reopening dates, shutdown permissions and decision deadlines into the tender documents. Our guide to how painting contractors collaborate with other trades explains why those interfaces need agreement before finishing starts.
Control the work and the release of rooms
Protect and strip. Cover floors, isolate vulnerable equipment and protect retained joinery before removing finishes. Maintain the agreed waste segregation and keep collection records. Protection must suit the surface beneath it, particularly where adhesive tape could damage an existing finish.
Repair, prime and coat. Complete substrate repairs, allow them to dry appropriately and use a compatible primer before the finish coats. Work from ceilings to walls and then doors and trim where the programme permits. Failure mode: painting before dusty cutting and sanding are complete contaminates fresh finishes and creates avoidable rework.
Reinstate and snag by zone. Inspect under the intended lighting, check edges and touch points, then return fittings and furniture without damaging the new work. Record defects against named owners rather than leaving an unassigned list until the project's end. Confirm each room is ready for use, not merely that the painter has left it.
Hand over the operating information. Supply the finish schedule, product data, colour references, cleaning guidance and waste records. Where systems have changed, include the relevant testing, commissioning and operating documents from those contractors. A verbal explanation at the door isn't a maintenance record.
A straightforward cosmetic floor can combine access planning and execution into carefully controlled out-of-hours work. A retrofit needs additional design, procurement and services coordination before the finishing stages can proceed.
Handover test: The next facilities manager should be able to identify the coating, find the maintenance instructions and understand what changed without phoning the original project team.
Keep the pack in the building's document system, with room references that match the plans. That makes later repairs more consistent and helps prevent serviceable finishes being replaced because nobody knows what they are.
Scheduling Work Around a Live Office
Treat occupied refurbishment as a traffic and access plan, not just a bar chart. People still need to reach desks, meeting rooms, welfare facilities and exits while contractors move equipment and materials through the same building.
On a typical floor, a contained zone can be protected and decorated while another remains operational. But the separation must address dust, noise, ventilation and escape routes, not just a strip of tape across the corridor.
Plan around the space people actually use
A meeting room may suit a weekend closure if preparation, coating and ventilation can be completed before its next booking. Reception needs a different approach because it may be the only public entrance and the route used by deliveries.
Don't promise a fixed shift pattern before assessing the substrate and coating system. A ceiling with staining or failed paint may need more preparation than clean walls, while doors can remain vulnerable to marking after they appear dry.
For people staying at their desks, plan a complete temporary move rather than repeated short relocations. Include monitors, confidential papers, accessibility needs and the help required to reconnect equipment.
Before mobilisation, settle the practical access details:
- Deliveries: Book lifts and loading bays, and identify parking or unloading restrictions.
- Security: Agree keys, alarm arrangements and the process for admitting contractors.
- Occupied rooms: Mark spaces that cannot close and keep routes to them protected.
- Approvals: Name someone authorised to resolve a colour or finish query outside normal office hours.
- Morning release: Identify who checks cleanliness, access and readiness before staff return.
Keep finishing separate from live operations
Schedule noisy or dusty preparation before quieter coating work. Where the building remains occupied, agree ventilation and isolation arrangements with the facilities team rather than assuming lower-odour products make separation unnecessary.
Daily tidying should remove trip hazards and leave agreed routes usable. It shouldn't mean dismantling essential containment prematurely to make the room look finished.
For a landlord managing a Dublin office and a Kildare property, use a common specification and colour schedule but separate access notes. Each address needs someone who can open, approve and accept the work locally.
Our commercial painting contractors guidance can help frame the decorating access discussion. In an enquiry, we ask for shared entrances, lift access, parking restrictions and occupied rooms because those details shape a realistic working arrangement.
A continuously occupied support floor may offer only a narrow shutdown window. If that window can't accommodate preparation, drying and safe reopening, reduce the zone size or arrange temporary accommodation rather than compressing the process beyond what the work allows.
Attach a one-page phasing note to the tender. Show the zones, permitted hours, protection boundaries, delivery route and required reopening point, with a named person responsible for accepting each area.
Painting Choices That Hold Up in Use
The visible part of many office refurbishments is a coating system, not just a colour. Filled plaster, primer and finish must work together on a sound substrate; paint won't stabilise damp walls, loose paper or a flaking film.
Investigate the cause of failure first. Remove unsound material using the assessed method, repair the surface and select a primer compatible with both the substrate and the proposed finish.

Specify for contact and cleaning
Use a durable, cleanable wall finish in corridors and tea points, and a suitable tougher system on frequently handled doors and reception joinery. A flatter finish can suit ceilings where surface imperfections matter more than repeated wiping.
Sheen names alone aren't enough. Check the manufacturer's intended substrate, cleaning guidance and application requirements, particularly where a wall will need frequent maintenance.
Low-VOC and lower-odour products can be appropriate for occupied projects, but they don't remove the need for ventilation and a controlled return to use. Test colour samples under the actual office lighting before approving the full area.
Match the finish to the room
Consider these different briefs:
- Landlord corridor: Durable neutral walls and crisp trim provide a maintainable background. Protect the floor and door hardware carefully, and choose a system that can withstand the intended cleaning method.
- Professional-services reception: A deep feature colour can work well behind the desk, but repaired plaster and consistent lighting matter as much as the shade. Plan furniture protection and reinstatement before the client-facing area closes.
- Small meeting room: Lining paper or a mural needs a properly prepared wall. Surface bumps and poor joints remain visible through a decorative treatment, so assess the substrate before selecting the pattern.
Suitable fitted joinery may be refinished rather than replaced. Check its material, existing coating and hardware condition before deciding whether spraying is appropriate.
Write wallpaper removal into the scope, including how damaged plaster revealed underneath will be handled. Otherwise, one quotation may assume a ready wall while another allows for stripping and repair.
External metal, render and boundary walls need their own specification and weather window. They aren't an extension of an internal emulsion package.
A usable finish schedule names the surface, repair, primer, finish product, colour and sheen. Keep that schedule for touch-ups rather than relying on a colour name alone.
Budgeting Before Quotes
Set the budget against the chosen scope before quotations arrive. A total without allowances for preparation, access and completion tells you little about the money needed to reopen the space.
Give every allowance a job
Use this checklist to build comparable pricing:
- Unknown conditions: Hold a clearly identified contingency for concealed defects, with a process for approving its use.
- Preparation: Separate decoration, plaster repair, wallpaper removal and joinery refinishing.
- Waste: Include strip-out, segregated collections and transfer documentation.
- Access: Identify out-of-hours work, protection, furniture movement and building attendance.
- Technical assessment: Keep any energy assessment or services investigation distinct from the finishing package.
- Completion: Agree payment milestones tied to inspected work and recorded zone handovers.
Our guide to painter rates in Ireland helps frame the decorating element, but the written scope remains the basis for comparison. GetBill's guidance on how to turn estimates into paid invoices is also useful for structuring clear descriptions, approvals and payment terms.
Compare what each contractor has included before comparing the totals.
Keep a one-page budget beside the programme, showing the allowance for each zone, exclusions, approved changes and the planned reopening point. That gives the landlord and facilities manager a shared record of what's being bought and when it becomes usable.
Set the Scope Before You Enquire
Write a sentence that names the project before contacting contractors: cosmetic refresh, targeted upgrade, energy retrofit or repositioning, plus whether staff will stay in the building. Where technical assessment is still outstanding, identify it as an open decision rather than asking a decorating quotation to cover an undefined building upgrade.
For a finishing enquiry, describe the operational event. Are you moving, reopening a business or coordinating with other renovations? Include the fixed date and distinguish essential completion from work that can follow later.
Send information that makes a quotation useful
We ask for the Dublin or Kildare address, the rooms and surfaces involved, and the access conditions. Include enough detail to distinguish the work from a general request to freshen the office:
- Surfaces: Ceilings, walls, woodwork, joinery and any exterior areas.
- Condition: Damaged plaster, existing wallpaper and furniture requiring refinishing.
- Access: Shared entrances, lift arrangements, parking restrictions and occupied rooms.
- Coordination: Other trades, furniture moves and the intended order of rooms.
If plaster repairs, wallpaper or furniture spraying belong in the project, include them at enquiry stage. Those decisions affect preparation and sequencing, not just appearance.
Our quotation sets out surfaces, repairs, products and access requirements so you can compare a defined package. Office visits must be arranged in advance; the useful starting point is an enquiry with the property details and the intended scope.
Alex Trend Painters offers commercial painting and decorating for offices, shops and managed premises, including the preparation and finishing work that a refurbishment needs. Visit Alex Trend Painters to enquire with your rooms, surfaces, access requirements and fixed dates, so the decorating package can be assessed alongside your wider project.